CPL manufactures coal carbonisation products ranging from smokeless
fuels to tars, coke and building products.
ExCAL aided the CPL Cwm Coking Works to
complete their IPPC permit application in a number of ways. We have:
- Carried out a site investigation for the site report
- The information provided by a previous site investigation in
1993 was supplemented by additional boreholes from which soil
and water samples were analysed. A full site report was prepared
for the permit application.
- Prepared the site closure plan - A major requirement
of IPPC permit applicants is to submit a site closure plan, which
is able to demonstrate that the installation may be decommissioned
safely in its current state. ExCAL were
commissioned by CPL to prepare a closure plan for their Cwm Coking
Works in Beddau.
- Conducted noise surveys (including frequency analysis)
- ExCAL were commissioned by CPL to determine
the existing noise climate around the site boundary of CPL Cwm
Coking Works. The Environmental Agency later requested a frequency
analysis to assess potential tonal emissions from operations at
the works.
- Conducted ecological surveys - ExCAL
conducted Benthic surveys (determining types of invertebrates
on the site to determine water contamination levels) in streams
both above and below the site, and ecological monitoring of lichens
and saplings at strategic locations around the site
- Undertaken atmospheric dispersion modelling - Using ADMS
3 and ADMS 3.1, ExCAL prepared atmospheric
dispersion models for Cwm Coking Works to determine the annual
maximum ground level concentrations (GLC) of various substances.
|